The Under Frequency Load Shedding Plan (UFLSP), also called Low Frequency Demand Disconnection Plan in EU Regulation 2017/2196 (LFDD Plan), is a fundamental element of the Defense Plan of the Electrical Power System. Its purpose is to avoid that the active power imbalances due to network separations lead to the disconnection of the generation groups and therefore to the blackout. The increase in production by the plants connected to the distribution networks in medium and low voltage makes the management of the UFLSP increasingly complex, whose optimization process started at TERNA in 2014 to ensure compliance with the required performances. In this paper an Adaptive UFLSP (A-UFLSP) is presented, based on the dynamic selection of the medium voltage lines to be disconnected. After defining a general algorithm, the main characteristics of the devices necessary for its implementation are established. The application to a real case demonstrates the capability of the A-UFLSP to remain equally effective as the load and generation conditions change in the distribution networks, even in the face of further foreseeable increases in production from Renewable Energy Sources (RES) through Distributed Generation (DG).

Under Frequency Load Shedding Plan in Active Power Systems: Analysis and Innovative Proposals / Scirocco T.B.; Bruno G.; Caciolli L.; Giannuzzi G.; Zaottini R.; Giorgi A.; Grasso F.; Rossi G.. - ELETTRONICO. - (2018), pp. 1-6. (Intervento presentato al convegno 110th AEIT International Annual Conference, AEIT 2018 tenutosi a ita nel 2018) [10.23919/AEIT.2018.8577330].

Under Frequency Load Shedding Plan in Active Power Systems: Analysis and Innovative Proposals

Caciolli L.
Writing – Original Draft Preparation
;
Giorgi A.
Writing – Review & Editing
;
Grasso F.
Validation
;
2018

Abstract

The Under Frequency Load Shedding Plan (UFLSP), also called Low Frequency Demand Disconnection Plan in EU Regulation 2017/2196 (LFDD Plan), is a fundamental element of the Defense Plan of the Electrical Power System. Its purpose is to avoid that the active power imbalances due to network separations lead to the disconnection of the generation groups and therefore to the blackout. The increase in production by the plants connected to the distribution networks in medium and low voltage makes the management of the UFLSP increasingly complex, whose optimization process started at TERNA in 2014 to ensure compliance with the required performances. In this paper an Adaptive UFLSP (A-UFLSP) is presented, based on the dynamic selection of the medium voltage lines to be disconnected. After defining a general algorithm, the main characteristics of the devices necessary for its implementation are established. The application to a real case demonstrates the capability of the A-UFLSP to remain equally effective as the load and generation conditions change in the distribution networks, even in the face of further foreseeable increases in production from Renewable Energy Sources (RES) through Distributed Generation (DG).
2018
2018 110th AEIT International Annual Conference, AEIT 2018
110th AEIT International Annual Conference, AEIT 2018
ita
2018
Goal 11: Sustainable cities and communities
Scirocco T.B.; Bruno G.; Caciolli L.; Giannuzzi G.; Zaottini R.; Giorgi A.; Grasso F.; Rossi G.
File in questo prodotto:
File Dimensione Formato  
08577330.pdf

Accesso chiuso

Descrizione: Articolo
Tipologia: Pdf editoriale (Version of record)
Licenza: Tutti i diritti riservati
Dimensione 383.45 kB
Formato Adobe PDF
383.45 kB Adobe PDF   Richiedi una copia

I documenti in FLORE sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificatore per citare o creare un link a questa risorsa: https://hdl.handle.net/2158/1181811
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 3
  • ???jsp.display-item.citation.isi??? 0
social impact