The Shift2Rail Innovation Programme (IP) is focussing on innovative technologies to enhance the overall railway market segments. Formal methods and standard interfaces have been identified as two key concepts to reduce time-to-market and costs, while ensuring safety, interoperability and standardisation. However, the decision to start using formal methods is still deemed too risky. Demonstrating technical and commercial benefits of both formal methods and standard interfaces is necessary to address the obstacles of learning curve and lack of clear cost/benefit analysis that are hindering their adoption, and this is the goal of the 4SECURail project, recently funded by the Shift2Rail IP. In this paper, we provide the reasoning and the rationale for designing the formal methods demonstrator for the 4SECURail project. The design concerns two important issues that have been analysed: (i) the usefulness of formal methods from the point of view of the infrastructure managers, (ii) the adoption of a semi-formal SysML notation within our formal methods demonstrator process.
Designing a Demonstrator of Formal Methods for Railways Infrastructure Managers / Basile D.; ter Beek M.H.; Fantechi A.; Ferrari A.; Gnesi S.; Masullo L.; Mazzanti F.; Piattino A.; Trentini D.. - STAMPA. - 12478:(2020), pp. 467-485. (Intervento presentato al convegno 9th International Symposium on Leveraging Applications of Formal Methods, Verification and Validation, ISoLA 2020 tenutosi a grc nel 2020) [10.1007/978-3-030-61467-6_30].
Designing a Demonstrator of Formal Methods for Railways Infrastructure Managers
Basile D.;Fantechi A.;Ferrari A.;Gnesi S.;
2020
Abstract
The Shift2Rail Innovation Programme (IP) is focussing on innovative technologies to enhance the overall railway market segments. Formal methods and standard interfaces have been identified as two key concepts to reduce time-to-market and costs, while ensuring safety, interoperability and standardisation. However, the decision to start using formal methods is still deemed too risky. Demonstrating technical and commercial benefits of both formal methods and standard interfaces is necessary to address the obstacles of learning curve and lack of clear cost/benefit analysis that are hindering their adoption, and this is the goal of the 4SECURail project, recently funded by the Shift2Rail IP. In this paper, we provide the reasoning and the rationale for designing the formal methods demonstrator for the 4SECURail project. The design concerns two important issues that have been analysed: (i) the usefulness of formal methods from the point of view of the infrastructure managers, (ii) the adoption of a semi-formal SysML notation within our formal methods demonstrator process.I documenti in FLORE sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.