The intervention involved the structural consolidation and partial reconstruction of the "Don Acciai" bridge in Genoa. The work, originally entirely in reinforced concrete, due to the over load produced in the foundation due to subsequent filling, has undergone a clearly visible low ering of one of the four existing piles. The intervention designed and executed, in variant with respect to the approved executive project, involved the demolition of a part of the bridge and its reconstruction with a steel structure, both for the rapidity of assembly on site and for the desire to reduce the permanent loads on existing structures. The proposed solution is character ized by a certain compositional and architectural originality, as well as being effective in pur suing the objectives of putting the bridge back into full operation. L’intervento ha riguardato il consolidamento strutturale e la parziale ricostruzione del ponte “Don Acciai” a Genova. L’opera, originariamente interamente in c.a., a causa del sovraccarico prodottosi in fondazione dovuto a riempimenti successivi di terreno, aveva subito un abbassa mento ben visibile di una delle quattro pile presenti, tanto da richiedere una parziale demoli zione e ricostruzione. L’intervento eseguito, progettato in variante rispetto al progetto esecuti vo approvato, ha previsto la demolizione di una parte del ponte e la sua ricostruzione con strut tura in acciaio, sia per la rapidità di assemblaggio in opera che per la volontà di ridurre i carichi permanenti gravanti sulle strutture esistenti. La soluzione proposta, risulta caratterizzata da una originalità compositiva, oltre che efficace nel perseguimento degli obiettivi di rimessa in funzione del ponte.
Lavori di consolidamento strutturale e parziale ricostruzione del ponte "Don Acciai" a Genova / Salvatore Giacomo Morano. - STAMPA. - Vol 2:(2022), pp. 817-824. (Intervento presentato al convegno XXVIII Congresso CTA - Le giornate italiana della costruzione in acciaio - The italian steel days tenutosi a Francavilla al mare nel 29 settembre 2022).
Lavori di consolidamento strutturale e parziale ricostruzione del ponte "Don Acciai" a Genova
Salvatore Giacomo Morano
2022
Abstract
The intervention involved the structural consolidation and partial reconstruction of the "Don Acciai" bridge in Genoa. The work, originally entirely in reinforced concrete, due to the over load produced in the foundation due to subsequent filling, has undergone a clearly visible low ering of one of the four existing piles. The intervention designed and executed, in variant with respect to the approved executive project, involved the demolition of a part of the bridge and its reconstruction with a steel structure, both for the rapidity of assembly on site and for the desire to reduce the permanent loads on existing structures. The proposed solution is character ized by a certain compositional and architectural originality, as well as being effective in pur suing the objectives of putting the bridge back into full operation. L’intervento ha riguardato il consolidamento strutturale e la parziale ricostruzione del ponte “Don Acciai” a Genova. L’opera, originariamente interamente in c.a., a causa del sovraccarico prodottosi in fondazione dovuto a riempimenti successivi di terreno, aveva subito un abbassa mento ben visibile di una delle quattro pile presenti, tanto da richiedere una parziale demoli zione e ricostruzione. L’intervento eseguito, progettato in variante rispetto al progetto esecuti vo approvato, ha previsto la demolizione di una parte del ponte e la sua ricostruzione con strut tura in acciaio, sia per la rapidità di assemblaggio in opera che per la volontà di ridurre i carichi permanenti gravanti sulle strutture esistenti. La soluzione proposta, risulta caratterizzata da una originalità compositiva, oltre che efficace nel perseguimento degli obiettivi di rimessa in funzione del ponte.File | Dimensione | Formato | |
---|---|---|---|
DonAcciai-CTA-2022_ITA.pdf
Accesso chiuso
Tipologia:
Pdf editoriale (Version of record)
Licenza:
Open Access
Dimensione
4.96 MB
Formato
Adobe PDF
|
4.96 MB | Adobe PDF | Richiedi una copia |
I documenti in FLORE sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.