Semi-flexible pavements in heavy loads areas are recommended to guarantee good perfor- mance and safety. They are usually constructed by placing a wearing layer of grouted mac- adam, a composite material consisting of a porous Hot Mix Asphalt (HMA) skeleton grouted with a cementitious matrix. However, its use is limited as the production process is quite complex and laborious. An effective alternative to grouted macadam can be represented by the Ready to Mix (RTM), recently implemented to offer performances comparable to those of the grouted macadam and a most effortless put-in-place process, and contemporarily leading to environmental and economic advantages. The present research investigated the early life field performance of a semi-flexible pavement including an RTM base. Three Falling Weight Deflectometer testing campaigns were carried out from 2017 to 2021. In particular, the semi-flexible pavement was compared to a reference flexible pavement entirely made with HMA in terms of temperature sensitivity as well as bearing capacity.

Early Life Field Performance of Innovative Sustainable semi-flexible Pavements / Alessandro Marradi, Chiara Mignini, Alessandro Friani, Arianna Stimilli, Tullio Caraffa. - STAMPA. - (2024), pp. 677-684. ( Road and Rail Infrastructure VIII, Proceedings of the Conference CETRA 2024 Cavtat, Croatia 15–17 May 2024).

Early Life Field Performance of Innovative Sustainable semi-flexible Pavements

Alessandro Marradi
;
2024

Abstract

Semi-flexible pavements in heavy loads areas are recommended to guarantee good perfor- mance and safety. They are usually constructed by placing a wearing layer of grouted mac- adam, a composite material consisting of a porous Hot Mix Asphalt (HMA) skeleton grouted with a cementitious matrix. However, its use is limited as the production process is quite complex and laborious. An effective alternative to grouted macadam can be represented by the Ready to Mix (RTM), recently implemented to offer performances comparable to those of the grouted macadam and a most effortless put-in-place process, and contemporarily leading to environmental and economic advantages. The present research investigated the early life field performance of a semi-flexible pavement including an RTM base. Three Falling Weight Deflectometer testing campaigns were carried out from 2017 to 2021. In particular, the semi-flexible pavement was compared to a reference flexible pavement entirely made with HMA in terms of temperature sensitivity as well as bearing capacity.
2024
8th International Conference on Road and Rail Infrastructure - Road and Rail Infrastructure VIII
Road and Rail Infrastructure VIII, Proceedings of the Conference CETRA 2024
Cavtat, Croatia
15–17 May 2024
Alessandro Marradi, Chiara Mignini, Alessandro Friani, Arianna Stimilli, Tullio Caraffa
File in questo prodotto:
File Dimensione Formato  
CETRA2024.pdf

accesso aperto

Tipologia: Pdf editoriale (Version of record)
Licenza: Open Access
Dimensione 537.89 kB
Formato Adobe PDF
537.89 kB Adobe PDF

I documenti in FLORE sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificatore per citare o creare un link a questa risorsa: https://hdl.handle.net/2158/1399755
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact