Driven by the needs of highly competitive markets, the performance requirements of today’s production systems are becoming evermore demanding. High availability is one of the key requirements for new machines and industrial plants. The objective of the present study is the assessment of the availability of a Gas Re-injection Plant used for the production of oil and gas in the Kashagan field (Kazakhstan). In order to asses the availability performance of this complex system, a broad set of studies has been conducted to gather accurate information in as much detail as possible as input for the availability analysis. Following this preliminary work, the availability analysis was performed using a simulation approach. The RBD technique, in conjunction with Monte Carlo simulations allowed many different elements to be evaluated simultaneously to determine the plant availability.
An approach to availability assessment for a raw gas re-injection plant for the production of oil and gas / Orlando Borgia; Filippo De Carlo; C. Michelassi; G. Monaci; G. Racioppi; D. Saccardi. - STAMPA. - 1:(2007), pp. 543-549. (Intervento presentato al convegno 16th European Safety and Reliability Conference tenutosi a Stavanger, Norway nel 25-27/06/2007).
An approach to availability assessment for a raw gas re-injection plant for the production of oil and gas
BORGIA, ORLANDO;DE CARLO, FILIPPO;
2007
Abstract
Driven by the needs of highly competitive markets, the performance requirements of today’s production systems are becoming evermore demanding. High availability is one of the key requirements for new machines and industrial plants. The objective of the present study is the assessment of the availability of a Gas Re-injection Plant used for the production of oil and gas in the Kashagan field (Kazakhstan). In order to asses the availability performance of this complex system, a broad set of studies has been conducted to gather accurate information in as much detail as possible as input for the availability analysis. Following this preliminary work, the availability analysis was performed using a simulation approach. The RBD technique, in conjunction with Monte Carlo simulations allowed many different elements to be evaluated simultaneously to determine the plant availability.File | Dimensione | Formato | |
---|---|---|---|
Atti Esrel.pdf
Accesso chiuso
Tipologia:
Versione finale referata (Postprint, Accepted manuscript)
Licenza:
Tutti i diritti riservati
Dimensione
4.17 MB
Formato
Adobe PDF
|
4.17 MB | Adobe PDF | Richiedi una copia |
I documenti in FLORE sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.