The construction project of the novel thermal neutron Brillouin spectrometer (BRISP) is entering its commissioning period. After a brief review of the scientific motivation and the technical components of the instrument, we present here a historical overview of the installation steps that have gradually brought such a difficult project into the present important phase.
Toward the commissioning phase of theBRIllouin spectrometer BRISP / D. AISA, S. AISA, E. BABUCCI, F. BAROCCHI, A. CUNSOLO, F. D’ANCA, A. DE FRANCESCO, F. FORMISANO, T. GAHL, E. GUARINI, A. LALONI, H. MUTKA, A. ORECCHINI, C. PETRILLO, W.-C. PILGRIM, A. PILUSO, F. SACCHETTI, J.-B. SUCK, G. VENTURI. - In: JOURNAL OF NEUTRON RESEARCH. - ISSN 1023-8166. - STAMPA. - 14:(2006), pp. 367-372. [DOI: 10.1080/10238160601049005]
Toward the commissioning phase of theBRIllouin spectrometer BRISP
BAROCCHI, FABRIZIO;GUARINI GRISALDI TAJA O DEL TAJA, ELEONORA
;
2006
Abstract
The construction project of the novel thermal neutron Brillouin spectrometer (BRISP) is entering its commissioning period. After a brief review of the scientific motivation and the technical components of the instrument, we present here a historical overview of the installation steps that have gradually brought such a difficult project into the present important phase.I documenti in FLORE sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.



