Rail roughness must be kept under control in a test site to ensure that it remains valid for type tests even some time after grinding. The paper presents the results of an analysis conducted on a high-speed track in Italy. Roughness measurements were carried out monthly for one year, starting one month after grinding. The analysis made by using a modified version of the long roughness measurement protocol gives a significant insight of the roughness growth phenomena.

Roughness growth – a practical case / A.Bracciali. - ELETTRONICO. - (2004), pp. 1-9. (Intervento presentato al convegno 8th International Workshop on Railway Noise tenutosi a Buxton, UK).

Roughness growth – a practical case

BRACCIALI, ANDREA
2004

Abstract

Rail roughness must be kept under control in a test site to ensure that it remains valid for type tests even some time after grinding. The paper presents the results of an analysis conducted on a high-speed track in Italy. Roughness measurements were carried out monthly for one year, starting one month after grinding. The analysis made by using a modified version of the long roughness measurement protocol gives a significant insight of the roughness growth phenomena.
2004
Proceeding of 8th International Workshop on Railway Noise, Buxton, UK
8th International Workshop on Railway Noise
Buxton, UK
A.Bracciali
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in FLORE sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificatore per citare o creare un link a questa risorsa: https://hdl.handle.net/2158/357076
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact