Centralised heating and cooling systems (i.e. district heating and cooling networks) are becoming increasingly widespread in many countries. At the same time, environmental concerns related to climate change are forcing many countries to consider increased implementing and co-generation of heat and power. Gas turbines are well suited to combined heat and power (CHP) applications in district heating systems. Gas turbines can produce electricity at relatively high efficiency, and the hot exhaust gasses can be used either directly to provide heat to the district heating network, or to generate steam to drive a conventional steam turbine CHP system. However, the heat load of a district heating network varies considerably over the course of the year, and the gas turbine CHP system must therefore often operate in off-design conditions, particularly at part load. When evaluating the overall performance of a gas turbine CHP system, it is important to account for all operating conditions encountered in the course of a typical heating season. This study examines the performance of gas turbine CHP systems for different operating conditions encountered when it is providing heat to a district heating system. Special emphasis is placed on evaluating part load performance, and discussing different operating strategies for part load operating of the CHP plant. The different strategies discussed are compared in terms of fuel usage and overall economy.

Part Load Operating Stategies for Gas Turbines in District Heating Applications / C Carcasci; Colitto Cormacchione. - In: PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS. PART A, JOURNAL OF POWER AND ENERGY. - ISSN 0957-6509. - STAMPA. - 215:(2001), pp. 529-544. [10.1243/0957650011538785]

Part Load Operating Stategies for Gas Turbines in District Heating Applications

CARCASCI, CARLO;
2001

Abstract

Centralised heating and cooling systems (i.e. district heating and cooling networks) are becoming increasingly widespread in many countries. At the same time, environmental concerns related to climate change are forcing many countries to consider increased implementing and co-generation of heat and power. Gas turbines are well suited to combined heat and power (CHP) applications in district heating systems. Gas turbines can produce electricity at relatively high efficiency, and the hot exhaust gasses can be used either directly to provide heat to the district heating network, or to generate steam to drive a conventional steam turbine CHP system. However, the heat load of a district heating network varies considerably over the course of the year, and the gas turbine CHP system must therefore often operate in off-design conditions, particularly at part load. When evaluating the overall performance of a gas turbine CHP system, it is important to account for all operating conditions encountered in the course of a typical heating season. This study examines the performance of gas turbine CHP systems for different operating conditions encountered when it is providing heat to a district heating system. Special emphasis is placed on evaluating part load performance, and discussing different operating strategies for part load operating of the CHP plant. The different strategies discussed are compared in terms of fuel usage and overall economy.
2001
215
529
544
C Carcasci; Colitto Cormacchione
File in questo prodotto:
File Dimensione Formato  
30_01_Journ_DistrictHeating_Colitto.pdf

Accesso chiuso

Tipologia: Versione finale referata (Postprint, Accepted manuscript)
Licenza: Tutti i diritti riservati
Dimensione 5.37 MB
Formato Adobe PDF
5.37 MB Adobe PDF   Richiedi una copia

I documenti in FLORE sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificatore per citare o creare un link a questa risorsa: https://hdl.handle.net/2158/771751
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 17
  • ???jsp.display-item.citation.isi??? 10
social impact