IL PRESENTE ARTICOLO ILLUSTRA UN'ATTIVITÀ DI RICERCA NELL'AMBITO DELLE APPLICAZIONI DI SISTEMI BJM Al TEMI DELLA "COSTRUIBILITÀ" DELL'ARCHITETTURA E IN PARTICOLARE ALLE PROCEDURE DI VALIDAZIONE DEL PROCESSO REALIZZATIVO. A TAL FINE È STATO INDIVIDUATO lL COMPLESSO ARCHITETTONICO DELLA NUOVA SEDE DELLA QUESTURA E PREFETTURA DI PISTOIA, REALIZZATO DALL'IMPRESA DI COSTRUZIONI CMSA, CHE HA PROMOSSO TALE STUDIO. LA RICERCA HA ANALIZZATO LE PROCEDURE EFFETTIVAMENTE ADOTTATE NELLE VARIE FASI DEL PROCESSO REALIZZATIVO AL FINE DI DEFINIRE l MARGINI DI OTTIMIZZAZIONE ATTRAVERSO SISTEMI BJM-BASED PER LA GESTIONE DEL PROGETTO E DEL CANTIERE. THIS PAPER DESCRIBES A RESEARCH ACTIVITY IN BJM SYSTEM APPLICATIONS ON THE TOPICS OF "CONSTRUCTABILITY" OF THE ARCHITECTURE ANO ON THE VALIDATION PROCEDURES FOR THE BUILDING PROCESS. To SUPPORT THIS PURPOSE, 1T WAS IDENTIFIED THE ARCHITECTURAL FACILITY OF THE NEW HEADQUARTERS OF THE PoucE AND PREFECTURE IN PISTOIA, BUILT BY THE CMSA CONSTRUCTION COMPANY, WHICH HAS PROMOTED THIS RESEARCH 1• THE WORK PRESENTED HERE HAS ANALYZED THE PROCEDURES ACTUALLY ADOPTED IN THE VARIOUS PHASES OF THE BUILDING PROCESS IN ORDER TO DEFINE THE OPTIMIZATION MARGINS THROUGH BJM-BASED SYSTEMS FOR THE PROJECT ANO SITE MANAGEMENT.
Reverse BIM per la validazione di processi costruttivi 4D e 5D | Reverse BIM for 4d and 5D validation of building processes / Verdiani, Giorgio; Biagini, Carlo; Ottobri, Paolo; Simoni, Letizia;. - ELETTRONICO. - (2018), pp. 1469-1480. (Intervento presentato al convegno 40° CONVEGNO INTERNAZIONALE DEI DOCENTI DELLE DISCIPLINE DELLA RAPPRESENTAZIONE QUINDICESIMO CONGRESSO UID tenutosi a MILANO nel 13 • 14 • 15 SETTEMBRE 2018).
Reverse BIM per la validazione di processi costruttivi 4D e 5D | Reverse BIM for 4d and 5D validation of building processes
Verdiani, Giorgio
Writing – Original Draft Preparation
;Biagini, Carlo
Writing – Review & Editing
;OTTOBRI, PAOLO
Investigation
;SIMONI, LETIZIA
Investigation
2018
Abstract
IL PRESENTE ARTICOLO ILLUSTRA UN'ATTIVITÀ DI RICERCA NELL'AMBITO DELLE APPLICAZIONI DI SISTEMI BJM Al TEMI DELLA "COSTRUIBILITÀ" DELL'ARCHITETTURA E IN PARTICOLARE ALLE PROCEDURE DI VALIDAZIONE DEL PROCESSO REALIZZATIVO. A TAL FINE È STATO INDIVIDUATO lL COMPLESSO ARCHITETTONICO DELLA NUOVA SEDE DELLA QUESTURA E PREFETTURA DI PISTOIA, REALIZZATO DALL'IMPRESA DI COSTRUZIONI CMSA, CHE HA PROMOSSO TALE STUDIO. LA RICERCA HA ANALIZZATO LE PROCEDURE EFFETTIVAMENTE ADOTTATE NELLE VARIE FASI DEL PROCESSO REALIZZATIVO AL FINE DI DEFINIRE l MARGINI DI OTTIMIZZAZIONE ATTRAVERSO SISTEMI BJM-BASED PER LA GESTIONE DEL PROGETTO E DEL CANTIERE. THIS PAPER DESCRIBES A RESEARCH ACTIVITY IN BJM SYSTEM APPLICATIONS ON THE TOPICS OF "CONSTRUCTABILITY" OF THE ARCHITECTURE ANO ON THE VALIDATION PROCEDURES FOR THE BUILDING PROCESS. To SUPPORT THIS PURPOSE, 1T WAS IDENTIFIED THE ARCHITECTURAL FACILITY OF THE NEW HEADQUARTERS OF THE PoucE AND PREFECTURE IN PISTOIA, BUILT BY THE CMSA CONSTRUCTION COMPANY, WHICH HAS PROMOTED THIS RESEARCH 1• THE WORK PRESENTED HERE HAS ANALYZED THE PROCEDURES ACTUALLY ADOPTED IN THE VARIOUS PHASES OF THE BUILDING PROCESS IN ORDER TO DEFINE THE OPTIMIZATION MARGINS THROUGH BJM-BASED SYSTEMS FOR THE PROJECT ANO SITE MANAGEMENT.File | Dimensione | Formato | |
---|---|---|---|
UID_2018_Biagini_Verdiani_Ottobri_c.pdf
Accesso chiuso
Tipologia:
Pdf editoriale (Version of record)
Licenza:
Tutti i diritti riservati
Dimensione
2.82 MB
Formato
Adobe PDF
|
2.82 MB | Adobe PDF | Richiedi una copia |
I documenti in FLORE sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.