The paper deals with the application of Building Information Modelling (BIM) to the documentation and preservation of Archaeological Heritage, illustrating the implementation process to a case study. The work process started from the historical analysis together with the geometric capturing of the built morphology. A 3D model was created by combining laser scans and a digital photogrammetric survey. To make all 3D data sets interoperable, it was developed a BIM project execution plan focused on the restoration of Shipwreck Museum in the Kyrenia Castle in Cyprus. The HBIM approach not only allows to represent of the existing historic fabric with an effective visualization but also to lead a complex analysis of designed interventions in various scenarios. BIM objects were modelled and managed parametrically for a synthetic definition of the individual elements. All the additional information besides the geometrical data were stored into the HBIM able to document the maintenance and to help the future works. It will be illustrated the procedure and the methodology by presenting the outcomes of the research.
BIM Design Lead for Restoration of ShipWreck Museum in Kyrenia Castle in Cyprus / Biagini Carlo; Capparelli Francesco; Verdiani Giorgio. - ELETTRONICO. - (2021), pp. 63-70. (Intervento presentato al convegno 9th Arqueologica 2.0 & 3rd Geores tenutosi a Valencia (Spain) nel 26-28 April 2021) [10.4995/arqueologica9.2021.12081].
BIM Design Lead for Restoration of ShipWreck Museum in Kyrenia Castle in Cyprus
Biagini Carlo
;Verdiani Giorgio
2021
Abstract
The paper deals with the application of Building Information Modelling (BIM) to the documentation and preservation of Archaeological Heritage, illustrating the implementation process to a case study. The work process started from the historical analysis together with the geometric capturing of the built morphology. A 3D model was created by combining laser scans and a digital photogrammetric survey. To make all 3D data sets interoperable, it was developed a BIM project execution plan focused on the restoration of Shipwreck Museum in the Kyrenia Castle in Cyprus. The HBIM approach not only allows to represent of the existing historic fabric with an effective visualization but also to lead a complex analysis of designed interventions in various scenarios. BIM objects were modelled and managed parametrically for a synthetic definition of the individual elements. All the additional information besides the geometrical data were stored into the HBIM able to document the maintenance and to help the future works. It will be illustrated the procedure and the methodology by presenting the outcomes of the research.File | Dimensione | Formato | |
---|---|---|---|
2021_Geores_12081-34632-1-PB.pdf
accesso aperto
Tipologia:
Pdf editoriale (Version of record)
Licenza:
Open Access
Dimensione
2.99 MB
Formato
Adobe PDF
|
2.99 MB | Adobe PDF |
I documenti in FLORE sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.