This paper presents the results of a research aimed at demonstrating the potentialities and cur-rent limits of some BIM-based approaches in the field of Facility Management. Today the management and interpretation of large amounts of data of different nature and disciplinary scope is one of the most relevant problems in the definition of new and more efficient information management processes in the construction sector. Two different processes are compared for the acquisition and management of the parameters needed for the asset management phases of existing school buildings. The first ethod involves the compilation of schedules within the BIM authoring software by means of an appropriate mapping of the parameters with reference to the information exchange scheme established by COBie (Construction-Operations Building Information exchange); the second method uses a spe-cific software for FM, dRofus, which is able to create a direct link with the BIM authoring software for the bi-lateral writing of the parameters. Through a comparative analysis, the results of the case study G. Rodari Primary and Infant School in Florence are discussed.

Gestione dati BIM-based nel ciclo di vita del patrimonio edilizio esistente: metodi a confronto / Bongini Andrea; Donato Vincenzo; Biagini Carlo. - In: DN. - ISSN 2610-8755. - ELETTRONICO. - n. 8:(2021), pp. 59-70.

Gestione dati BIM-based nel ciclo di vita del patrimonio edilizio esistente: metodi a confronto

Bongini Andrea;Donato Vincenzo;Biagini Carlo
2021

Abstract

This paper presents the results of a research aimed at demonstrating the potentialities and cur-rent limits of some BIM-based approaches in the field of Facility Management. Today the management and interpretation of large amounts of data of different nature and disciplinary scope is one of the most relevant problems in the definition of new and more efficient information management processes in the construction sector. Two different processes are compared for the acquisition and management of the parameters needed for the asset management phases of existing school buildings. The first ethod involves the compilation of schedules within the BIM authoring software by means of an appropriate mapping of the parameters with reference to the information exchange scheme established by COBie (Construction-Operations Building Information exchange); the second method uses a spe-cific software for FM, dRofus, which is able to create a direct link with the BIM authoring software for the bi-lateral writing of the parameters. Through a comparative analysis, the results of the case study G. Rodari Primary and Infant School in Florence are discussed.
2021
DN
n. 8
59
70
Bongini Andrea; Donato Vincenzo; Biagini Carlo
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in FLORE sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificatore per citare o creare un link a questa risorsa: https://hdl.handle.net/2158/1241217
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact